You will be responsible of the following:
v Design Seamless Access MPLS Network and configuration according to FOC route plan prepared by OSP planning team to ensure it synchronized with physical and logical configurations
v Review and approve the high level FOC route plan and Fiber Distribution Detail (FDD) diagram prepared by OSP planning team to ensure it synchronized with the network configuration
v Analyze 5G candidate ATN sites performance and check on uplinks & downlinks capacity availability to design appropriate Node expansion
v Analyze full Access MPLS network performance, capacity utilization, and transmission requirements for live network nodes to design appropriate backbone expansion
v Produce the BOQ (Bill of Quantity) for the required Access MPLS equipment and make sure it is align with Ooredoo Group Price Book
v Create implementation roadmaps and guidelines with Huawei for 5G project implantation strategy considering Site Acquisition, FOC Civil Work, Power, Installation, Integration, Migration, Acceptance and Closure
v Manage, execute and implement of the hardware equipment according to agreed implantation strategy and make sure it implemented under Ooredoo site Installation standards.
v Coordinate with CPIM & PMs team to provide all the necessaries to put the site on air (shelter, AC/Mains Power, Rectifier, Genset) or request for a new site construction.
v Managing transmission project administration work such survey reports, fiber assignment port details, Node acceptance documents and as built/site document.
v Technical support of all queries